Sustained Power Outage: DC Shutdown

When extreme heat triggers a regional blackout, will your teams know when and how to shut down critical infrastructure? This Microsimulation forces tactical teams to validate data centre shutdown readiness, communication flow, and procedural interdependencies.

A catastrophic heatwave leads to widespread grid failure, forcing organisations to consider drastic action: a controlled shutdown of their primary data centre. This Microsimulation tests tactical preparedness, technical decision-making, and procedural clarity under constrained, real-time conditions. Ideal for stress-testing your organisation’s ability to respond, coordinate, and protect data when the lights go out.

Objective:

  • Increase awareness to initial protocols required before datacentre shutdown procedures commence
  • Validate Shut Down playbook and procedures
  • Validate batch job requirements and dependencies between them and backup activities
  • Validate Month End batch job timelines

this is where the syllubus goes

Additional information is here

No periods were set for this course

Scale scenario simulations. See how it works or book a personalized demo.Book a demo